Contact Us

Colorado Springs

Our Colorado Springs office handles work across the Pikes Peak region, including the I-25/Cimarron interchange rebuild and city road and bridge projects on Academy Boulevard and Circle Drive. To schedule field testing in Colorado Springs or Pueblo, call dispatch at (719) 235-2023.

The Vivid Engineering Group Colorado Springs office staff standing outside of the office, posed for a group photo.

Visit or Call

Colorado Springs Office



Phone

(719) 896-4356


Projects around Colorado Springs

See Every Project on the Map

Transportation

I-25/Cimarron Interchange Design Build

I-25 and Cimarron Street (US 24) interchange, Colorado Springs, CO

The I-25/Cimarron Street (US 24) interchange is the gateway to downtown Colorado Springs and one of the busiest junctions in the Pikes Peak region. Decades of poor roadway performance — settlement of embankments and walls on soft soils along Fountain Creek — had made it a persistent maintenance problem. CDOT's $77 million design-build reconstruction, delivered with Kraemer North America, completely rebuilt the interchange: new bridge foundations and bridges, new embankments, numerous MSE retaining walls, temporary and permanent pavements, improvements to the major drainages, and culvert and jack-and-bore utility installations.<br /> <br /> Vivid Engineering supported the project with quality oversight, construction inspection and materials testing, geotechnical design, and structural fill monitoring. Because of the corridor's history of settlement, significant analysis, design, and construction monitoring were performed to protect the new embankments and retaining walls — work grounded in our team's deep experience with DOT and FHWA design-build requirements, procedures, and specifications. The result is a modern interchange built to perform on ground that had troubled the corridor for decades.

View project

Transportation

Military Access, Mobility & Safety Improvement Project

South Academy Boulevard widening and Pikes Peak region corridors, El Paso County, CO

The Military Access, Mobility & Safety Improvement Project (MAMSIP) is a $161 million, five-year program to improve the corridors connecting Fort Carson, Peterson Space Force Base, Schriever Space Force Base, and Cheyenne Mountain Space Force Station — funded by CDOT, El Paso County, the Pikes Peak Rural Transportation Authority, and an $18.35 million federal BUILD grant. Built by SEMA Construction from June 2021 to July 2026, the program delivered safety improvements and a jug-handle intersection on CO 94; a full rebuild of Charter Oak Ranch Road with a new roundabout at Santa Fe Avenue; 7.5 miles of I-25 work between South Academy Boulevard and Fountain, including two replacement bridges, a concrete overlay, and a full-length median barrier; and finally the widening of South Academy Boulevard from two to three lanes in each direction, with bridge widening over Fountain Creek, US 85/87, and Bradley Road.<br /> <br /> Vivid Engineering served as the lead materials quality assurance testing firm for the program, overseeing all materials documentation, field testing, and inspection — including the South Academy Boulevard widening in El Paso County — to verify that every element met CDOT and FHWA standards for safety and durability.

View project

Government

Garden Of The Gods Flood Mitigation Facility

Garden of the Gods Road at Camp Creek, Colorado Springs, CO 80904

After the 2012 Waldo Canyon Fire burned much of the Camp Creek watershed, storm runoff into the neighborhoods below Garden of the Gods became a serious flood risk. The City of Colorado Springs' answer was a stormwater detention and sediment collection facility in the park's northeast corner, funded through FEMA's Hazard Mitigation Program with state and city dollars. Built by Mortenson Construction, the $7.8 million facility includes a 27-foot earthen embankment, roughly 170 acre-feet of storage, a 365-foot roller-compacted concrete spillway, an 8-by-6-foot reinforced concrete outlet box, and a realigned grouted-boulder channel to carry Camp Creek — about 185,000 cubic yards of earthwork in all. Completed in December 2020, the facility helps protect more than 100 properties along the 31st Street corridor.<br /> <br /> Vivid Engineering provided construction engineering, inspection, and materials testing for the project, working with Mortenson and the City to verify the quality of earthwork, compacted embankment, concrete, and grouted boulder construction — the elements the facility's long-term flood resilience depends on.

View project

Closer to another office?

Every office works as one team. Call whichever is closest and we will bring in the people the job needs.

All Locations

Denver

3885 Forest Street, Denver, Colorado, 80207

(303) 478-9087

View Office

Pueblo West

621 E. Enterprise Drive, Pueblo West, Colorado, 81007

(719) 896-4356

View Office