Contact Us

Pueblo West

Visit or Call

Pueblo West Office



Phone

(719) 896-4356


Projects around Pueblo West

See Every Project on the Map

Energy

Colorado's Power Pathway

Approximately 550 miles of 345 kV transmission line across twelve eastern Colorado counties, Fort St. Vrain to Harvest Mile

Colorado's Power Pathway is Xcel Energy's $1.7 billion expansion of the state's high-voltage grid: approximately 550 miles of new double-circuit 345 kV transmission line looping through twelve counties of eastern Colorado, along with new and expanded substations, built to deliver roughly 5,500 megawatts of new wind and solar generation planned through 2030. The line runs from the Fort St. Vrain generating station in Weld County south through Morgan, Kit Carson, Cheyenne, Kiowa, Crowley, and Pueblo Counties, then back north through El Paso, Elbert, and Arapahoe to the Harvest Mile substation — one of the largest transmission builds in the western United States. The first segments entered service in spring 2025, with full program completion expected in 2027.<br /> <br /> Vivid Engineering Group has served as owner's representative on all five segments of the program, providing quality assurance testing and inspection of transmission structure foundations and substation sites, along with geotechnical engineering. On site since 2023, our field teams and geotechnical engineers have verified the integrity of the drilled foundations that carry every steel structure along the route and supported construction at the program's new substations — Canal Crossing, Goose Creek, and May Valley — as well as expansions of existing facilities. Working across the open plains of eastern Colorado, often far from the nearest laboratory, Vivid's crews have kept sampling, testing, and inspection moving at the pace of the build, segment after segment, from the first foundation to the last.

View project

Transportation

Cañon City's 2A Street Repair

1st Street and Main Street, Cañon City, CO 81212

In November 2016, Cañon City voters approved Referendum 2A, a one-percent sales tax dedicated entirely to repairing and replacing the city's streets. The 2024 program year was one of the largest to date: a $6.55 million slate that included full reconstruction of 1st and Main Street from US 50 to 4th Street and Pear Avenue from 19th Street to Field Avenue, along with resurfacing of 5th Street between Fairview Avenue and High Street and Harrison Avenue between 9th and 15th Streets. Year by year, the 2A program has worked through the roughly two-thirds of city streets once rated in poor condition.<br /> <br /> Vivid Engineering served as project manager and the inspection and testing lead for the 2024 work — managing construction on the City's behalf, inspecting reconstruction and paving operations, and testing soils, aggregates, concrete, and asphalt against project specifications. The result is a set of rebuilt downtown streets that meet national standards and will serve Cañon City for decades.

View project

Transportation

City of Cañon City Referendum 2A Program

Citywide street program, Cañon City, CO 81212

In November 2016, Cañon City voters approved Referendum 2A, a one-percent sales tax increase dedicated exclusively to contracting out street repair and replacement. The tax generates an average of $3.5 million a year across a 10-year program — $9 million of design-build work in the first year, 2017, followed by annual design-bid-build programs every year since.<br /> <br /> Vivid serves as the City's prime consultant and owner's representative for the program. Our team performs geotechnical investigations; prepares pavement designs for composite pavement, full-depth reclamation, and asphalt and concrete mill-and-overlay; and delivers civil plans and specifications covering roadway plan and profile, utility relocations, drainage, streetscape and ADA compliance, Safe Routes to School, stormwater management, quantities, and engineer's estimates, with Wilson & Company preparing civil plans as a subconsultant. Vivid supports bid document preparation, bid award, and pre-construction meetings, then serves as construction engineer through the build — providing construction inspection, quality management, and materials testing on every project. The result is a program that has steadily rebuilt the streets Cañon City residents voted to fix.

View project

Closer to another office?

Every office works as one team. Call whichever is closest and we will bring in the people the job needs.

All Locations

Idaho

123 Street Name Rd, Boise, ID, 99999

(999) 999-9999

View Office

Denver

3885 Forest Street, Denver, Colorado, 80207

(303) 478-9087

View Office