Contact Us

30th Street Corridor

Transportation

Test subtitle

A safer road to Garden of the Gods.

30th Street is the main route into Garden of the Gods Park, carrying park visitors, neighborhood traffic, and cyclists on a narrow, winding two-lane road with little margin for error. The City of Colorado Springs’ 30th Street Corridor Improvement Project rebuilt roughly three miles between Mesa Road and Fontanero Street: widening the roadway with paved multi-use shoulders, adding a roundabout at Gateway Road, upgrading intersections, building a pedestrian underpass, and installing a new storm sewer system with a water quality pond. More than 2,000 feet of retaining walls and 6,300 feet of soldier pile were needed to hold the widened road on the hillside.

Vivid Engineering led quality assurance testing and served on the construction inspection team for the project, verifying soils, concrete, and asphalt — including some 14,000 tons of asphalt and 21,000 feet of curb and gutter — against project specifications. The improvements strengthened emergency access and evacuation routes and created safer travel for motorists, cyclists, and pedestrians on the way into one of the region’s most visited parks.

Project Details

  • Client

    City of Colorado Springs

  • Contractor

    Wildcat Construction

  • Location

    30th Street, Mesa Road to Fontanero Street – Colorado Springs, CO

  • Timeline

    October 2021 – September 2023

  • Sector

    Transportation

  • Services

    Construction Inspection & Testing

  • Transportation

    City of Cañon City Referendum 2A Program

    Citywide street program, Cañon City, CO 81212

    In November 2016, Cañon City voters approved Referendum 2A, a one-percent sales tax increase dedicated exclusively to contracting out street repair and replacement. The tax generates an average of $3.5 million a year across a 10-year program — $9 million of design-build work in the first year, 2017, followed by annual design-bid-build programs every year since.<br /> <br /> Vivid serves as the City's prime consultant and owner's representative for the program. Our team performs geotechnical investigations; prepares pavement designs for composite pavement, full-depth reclamation, and asphalt and concrete mill-and-overlay; and delivers civil plans and specifications covering roadway plan and profile, utility relocations, drainage, streetscape and ADA compliance, Safe Routes to School, stormwater management, quantities, and engineer's estimates, with Wilson & Company preparing civil plans as a subconsultant. Vivid supports bid document preparation, bid award, and pre-construction meetings, then serves as construction engineer through the build — providing construction inspection, quality management, and materials testing on every project. The result is a program that has steadily rebuilt the streets Cañon City residents voted to fix.

  • Transportation

    I-25/Cimarron Interchange Design Build

    I-25 and Cimarron Street (US 24) interchange, Colorado Springs, CO

    The I-25/Cimarron Street (US 24) interchange is the gateway to downtown Colorado Springs and one of the busiest junctions in the Pikes Peak region. Decades of poor roadway performance — settlement of embankments and walls on soft soils along Fountain Creek — had made it a persistent maintenance problem. CDOT's $77 million design-build reconstruction, delivered with Kraemer North America, completely rebuilt the interchange: new bridge foundations and bridges, new embankments, numerous MSE retaining walls, temporary and permanent pavements, improvements to the major drainages, and culvert and jack-and-bore utility installations.<br /> <br /> Vivid Engineering supported the project with quality oversight, construction inspection and materials testing, geotechnical design, and structural fill monitoring. Because of the corridor's history of settlement, significant analysis, design, and construction monitoring were performed to protect the new embankments and retaining walls — work grounded in our team's deep experience with DOT and FHWA design-build requirements, procedures, and specifications. The result is a modern interchange built to perform on ground that had troubled the corridor for decades.

  • Transportation

    2C Road Improvement

    Citywide road program, Colorado Springs, CO

    In 2015, Colorado Springs voters approved the 2C sales tax to tackle a backlog of failing streets, and they renewed it in 2019 and again in 2024. Since the program began in 2016 it has repaved more than 1,900 lane miles, rebuilt roughly 400 miles of curb and gutter, and installed thousands of new and retrofitted pedestrian ramps across the city — one of the largest sustained paving efforts in Colorado, with about half of every dollar going to the concrete beside the road.<br /> <br /> Vivid Engineering serves as one of the lead quality assurance testing firms for the program's concrete and asphalt work. Our technicians test and document paving, sidewalks, curbs, gutters, and pedestrian ramps across each year's project list, verifying that every placement meets City specifications. That oversight protects the long-term durability of the investment and helps the City deliver smoother streets and better accessibility, year after year.

Have a project with conditions like these?

Talk with the engineers and inspectors who work on projects just like this every day.